Skip Navigation Infiltrator Water Technologies Logo

Equalizer 24 Chambers Integral Component of Community Onsite Wastewater Treatment System

Stoneridge is a 20-home and 36-condo unit subdivision encompassing 38 acres along Bob’s Creek in Troy, Missouri. To complete the development, a site-sensitive wastewater treatment system was proposed to safeguard the adjacent creek and meet Missouri Department of Natural Resources (MoDNR) regulations. Connecting to a municipal wastewater treatment plant was not an option due to the higher cost and therefore a non-discharge, more cost-effective solution was needed.

Project Snapshot

System Specifications: Septic tank effluent pump (STEP) system

Infiltrator Products Used: 7,040 linear feet of Equalizer 24 chambers in pressurized drainfields

Average Design Flow: 12,000 GPD

Download the Full Case Study ›